The China Mail - NASA Moon rocket ready for second attempt at liftoff

USD -
AED 3.673042
AFN 72.000368
ALL 87.274775
AMD 390.940403
ANG 1.80229
AOA 912.000367
ARS 1137.970104
AUD 1.565349
AWG 1.8
AZN 1.70397
BAM 1.720686
BBD 2.017877
BDT 121.428069
BGN 1.721593
BHD 0.376901
BIF 2930
BMD 1
BND 1.312071
BOB 6.906563
BRL 5.808204
BSD 0.999437
BTN 85.314611
BWP 13.77569
BYN 3.270808
BYR 19600
BZD 2.007496
CAD 1.384165
CDF 2877.000362
CHF 0.81849
CLF 0.025203
CLP 967.160396
CNY 7.30391
CNH 7.30369
COP 4310
CRC 502.269848
CUC 1
CUP 26.5
CVE 97.403894
CZK 22.038604
DJF 177.720393
DKK 6.56557
DOP 60.503884
DZD 132.56604
EGP 51.126904
ERN 15
ETB 133.023649
EUR 0.879325
FJD 2.283704
FKP 0.753159
GBP 0.753835
GEL 2.740391
GGP 0.753159
GHS 15.56039
GIP 0.753159
GMD 71.503851
GNF 8655.503848
GTQ 7.698128
GYD 209.656701
HKD 7.76252
HNL 25.908819
HRK 6.612104
HTG 130.419482
HUF 359.10504
IDR 16862.9
ILS 3.68395
IMP 0.753159
INR 85.377504
IQD 1310
IRR 42125.000352
ISK 127.590386
JEP 0.753159
JMD 157.965583
JOD 0.709304
JPY 142.17104
KES 129.503801
KGS 87.233504
KHR 4015.00035
KMF 433.503794
KPW 899.977001
KRW 1418.390383
KWD 0.30663
KYD 0.832893
KZT 523.173564
LAK 21630.000349
LBP 89600.000349
LKR 298.915224
LRD 199.975039
LSL 18.856894
LTL 2.95274
LVL 0.60489
LYD 5.470381
MAD 9.275039
MDL 17.289555
MGA 4552.892736
MKD 54.091003
MMK 2099.608303
MNT 3548.057033
MOP 7.990393
MRU 39.435529
MUR 45.090378
MVR 15.403739
MWK 1736.000345
MXN 19.72174
MYR 4.407504
MZN 63.905039
NAD 18.856894
NGN 1604.703725
NIO 36.775056
NOK 10.481075
NPR 136.503202
NZD 1.685133
OMR 0.384998
PAB 0.999437
PEN 3.763039
PGK 4.133235
PHP 56.712504
PKR 280.603701
PLN 3.762405
PYG 7999.894426
QAR 3.640604
RON 4.378104
RSD 103.137317
RUB 82.174309
RWF 1415
SAR 3.752237
SBD 8.368347
SCR 14.241693
SDG 600.503676
SEK 9.63369
SGD 1.310745
SHP 0.785843
SLE 22.775038
SLL 20969.483762
SOS 571.503662
SRD 37.15037
STD 20697.981008
SVC 8.745073
SYP 13001.68631
SZL 18.820369
THB 33.347038
TJS 10.733754
TMT 3.5
TND 2.988038
TOP 2.342104
TRY 38.12382
TTD 6.781391
TWD 32.524038
TZS 2687.503631
UAH 41.417687
UGX 3663.55798
UYU 41.913007
UZS 12986.521678
VES 80.85863
VND 25870
VUV 121.398575
WST 2.784098
XAF 577.111964
XAG 0.030658
XAU 0.000301
XCD 2.70255
XDR 0.717698
XOF 575.000332
XPF 102.775037
YER 245.250363
ZAR 18.840363
ZMK 9001.203587
ZMW 28.458439
ZWL 321.999592
  • SCS

    0.0500

    9.76

    +0.51%

  • AZN

    0.5400

    67.59

    +0.8%

  • NGG

    0.6300

    72.11

    +0.87%

  • GSK

    0.5600

    35.93

    +1.56%

  • CMSD

    0.0400

    21.96

    +0.18%

  • RBGPF

    63.5900

    63.59

    +100%

  • BTI

    0.5400

    42.37

    +1.27%

  • BP

    0.6600

    28.32

    +2.33%

  • CMSC

    0.0400

    21.82

    +0.18%

  • RIO

    1.0100

    58.17

    +1.74%

  • JRI

    0.1600

    12.4

    +1.29%

  • BCE

    0.4200

    22.04

    +1.91%

  • RELX

    1.0000

    52.2

    +1.92%

  • BCC

    0.7800

    93.47

    +0.83%

  • VOD

    0.1400

    9.31

    +1.5%

  • RYCEF

    -0.1400

    9.36

    -1.5%

NASA Moon rocket ready for second attempt at liftoff
NASA Moon rocket ready for second attempt at liftoff / Photo: © AFP

NASA Moon rocket ready for second attempt at liftoff

After technical issues halted its first launch attempt, NASA will try again on Saturday to get its new 30-story rocket off the ground and send its unmanned test capsule towards the Moon.

Text size:

If the massive Space Launch System (SLS) lifts off successfully, it will not only be awe-inspiring but also historic for NASA, marking the first of its Artemis program plotting a return to the Moon, fifty years after the final Apollo mission.

The launch is scheduled for 2:17 pm local time (1817 GMT) from Kennedy Space Center in Florida, with a possible two-hour delay if necessary.

"Our team is ready," said Jeremy Parsons, deputy manager of exploration ground systems at Kennedy Space Center, on Friday.

"They are getting better with every attempt and actually performed superbly during launch countdown number one... I think if the conditions with weather and the hardware align, we'll absolutely go."

Though the area around the launch site will be closed to the public, hundreds of thousands of people are expected to gather on beaches nearby to see -- and hear -- the most powerful vehicle that NASA has ever launched climb into space.

NASA's initial launch attempt on Monday was halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

Both issues have since been resolved, and the weather appears to be cooperating: the US Space Force predicts a 60 percent chance of favorable weather at the scheduled liftoff time, growing to 80 percent later in the launch window.

If something requires NASA to stand down again on Saturday, there are backup opportunities on Monday or Tuesday. After that, the next launch window will not be until September 19 at the earliest, due to the Moon's position.

The purpose of the Artemis 1 mission is to verify that the Orion capsule, which sits atop the SLS rocket, is safe to carry astronauts in the future.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

- Apollo's twin sister -

It will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach. The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

Fittingly, NASA's first woman launch director, Charlie Blackwell-Thompson, will give the final "go" for liftoff on Saturday.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns.

A government audit estimates the program's cost will grow to $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

According to NASA chief Bill Nelson, a manned trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

B.Carter--ThChM