The China Mail - All systems go for Artemis 1 mission to Moon

USD -
AED 3.673042
AFN 72.000368
ALL 87.274775
AMD 390.940403
ANG 1.80229
AOA 912.000367
ARS 1137.970104
AUD 1.565349
AWG 1.8
AZN 1.70397
BAM 1.720686
BBD 2.017877
BDT 121.428069
BGN 1.721593
BHD 0.376901
BIF 2930
BMD 1
BND 1.312071
BOB 6.906563
BRL 5.808204
BSD 0.999437
BTN 85.314611
BWP 13.77569
BYN 3.270808
BYR 19600
BZD 2.007496
CAD 1.384165
CDF 2877.000362
CHF 0.81849
CLF 0.025203
CLP 967.160396
CNY 7.30391
CNH 7.30369
COP 4310
CRC 502.269848
CUC 1
CUP 26.5
CVE 97.403894
CZK 22.038604
DJF 177.720393
DKK 6.56557
DOP 60.503884
DZD 132.56604
EGP 51.126904
ERN 15
ETB 133.023649
EUR 0.879325
FJD 2.283704
FKP 0.753159
GBP 0.753835
GEL 2.740391
GGP 0.753159
GHS 15.56039
GIP 0.753159
GMD 71.503851
GNF 8655.503848
GTQ 7.698128
GYD 209.656701
HKD 7.76252
HNL 25.908819
HRK 6.612104
HTG 130.419482
HUF 359.10504
IDR 16862.9
ILS 3.68395
IMP 0.753159
INR 85.377504
IQD 1310
IRR 42125.000352
ISK 127.590386
JEP 0.753159
JMD 157.965583
JOD 0.709304
JPY 142.17104
KES 129.503801
KGS 87.233504
KHR 4015.00035
KMF 433.503794
KPW 899.977001
KRW 1418.390383
KWD 0.30663
KYD 0.832893
KZT 523.173564
LAK 21630.000349
LBP 89600.000349
LKR 298.915224
LRD 199.975039
LSL 18.856894
LTL 2.95274
LVL 0.60489
LYD 5.470381
MAD 9.275039
MDL 17.289555
MGA 4552.892736
MKD 54.091003
MMK 2099.608303
MNT 3548.057033
MOP 7.990393
MRU 39.435529
MUR 45.090378
MVR 15.403739
MWK 1736.000345
MXN 19.72174
MYR 4.407504
MZN 63.905039
NAD 18.856894
NGN 1604.703725
NIO 36.775056
NOK 10.481075
NPR 136.503202
NZD 1.685133
OMR 0.384998
PAB 0.999437
PEN 3.763039
PGK 4.133235
PHP 56.712504
PKR 280.603701
PLN 3.762405
PYG 7999.894426
QAR 3.640604
RON 4.378104
RSD 103.137317
RUB 82.174309
RWF 1415
SAR 3.752237
SBD 8.368347
SCR 14.241693
SDG 600.503676
SEK 9.63369
SGD 1.310745
SHP 0.785843
SLE 22.775038
SLL 20969.483762
SOS 571.503662
SRD 37.15037
STD 20697.981008
SVC 8.745073
SYP 13001.68631
SZL 18.820369
THB 33.347038
TJS 10.733754
TMT 3.5
TND 2.988038
TOP 2.342104
TRY 38.12382
TTD 6.781391
TWD 32.524038
TZS 2687.503631
UAH 41.417687
UGX 3663.55798
UYU 41.913007
UZS 12986.521678
VES 80.85863
VND 25870
VUV 121.398575
WST 2.784098
XAF 577.111964
XAG 0.030658
XAU 0.000301
XCD 2.70255
XDR 0.717698
XOF 575.000332
XPF 102.775037
YER 245.250363
ZAR 18.840363
ZMK 9001.203587
ZMW 28.458439
ZWL 321.999592
  • JRI

    0.1600

    12.4

    +1.29%

  • BCC

    0.7800

    93.47

    +0.83%

  • SCS

    0.0500

    9.76

    +0.51%

  • CMSD

    0.0400

    21.96

    +0.18%

  • NGG

    0.6300

    72.11

    +0.87%

  • BTI

    0.5400

    42.37

    +1.27%

  • GSK

    0.5600

    35.93

    +1.56%

  • BP

    0.6600

    28.32

    +2.33%

  • CMSC

    0.0400

    21.82

    +0.18%

  • AZN

    0.5400

    67.59

    +0.8%

  • RBGPF

    63.5900

    63.59

    +100%

  • BCE

    0.4200

    22.04

    +1.91%

  • RELX

    1.0000

    52.2

    +1.92%

  • RYCEF

    -0.1400

    9.36

    -1.5%

  • VOD

    0.1400

    9.31

    +1.5%

  • RIO

    1.0100

    58.17

    +1.74%

All systems go for Artemis 1 mission to Moon
All systems go for Artemis 1 mission to Moon / Photo: © AFP/File

All systems go for Artemis 1 mission to Moon

Fifty years after the last Apollo mission, the Artemis program is poised to take up the baton of lunar exploration with a test launch on Monday of NASA's most powerful rocket ever.

Text size:

The goal is to return humans to the Moon for the first time since the last Apollo mission in 1972 -- and eventually to Mars.

The 322-foot (98-meter) Space Launch System (SLS) rocket is scheduled to blast off at 8:33 am (1233 GMT) from the Kennedy Space Center (KSC) in Florida.

The mission, more than a decade in the planning, may be uncrewed, but is highly symbolic for NASA, which has been under pressure from China and private rivals such as SpaceX.

Hotels around Cape Canaveral are booked solid with between 100,000 and 200,000 spectators expected to attend the launch.

The massive orange-and-white rocket has been sitting on KSC's Launch Complex 39B for a week.

"Ever since we rolled out to the pad last week, you can feel the excitement, the energy," said Janet Petro, director of KSC. "It's really, really palpable."

The objective of the flight, baptized Artemis 1, is to test the SLS and the Orion crew capsule that sits atop the rocket.

Mannequins equipped with sensors will take the place of crew members, recording acceleration, vibration and radiation levels.

Cameras will capture every moment of the 42-day trip and include a selfie of the spacecraft with the Moon and Earth in the background.

- Splashdown in Pacific -

The Orion capsule will orbit around the Moon, coming within 60 miles (100 kilometers) at its closest approach and then firing its engines to get to a distance 40,000 miles beyond, a record for a spacecraft rated to carry humans.

One of the primary objectives of the mission is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to the Earth's atmosphere, the heat shield will have to withstand a speed of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius).

Orion, its descent slowed by parachutes, will end its voyage with a splashdown off the coast of San Diego in the Pacific.

Monday's liftoff will be at the mercy of the weather, which can be unpredictable in Florida at this time of year, and NASA has built in a two-hour launch window.

If the rocket is unable to take off on Monday, September 2 and 5 have been penciled in as alternative flight dates.

Otherwise, it's all systems go.

NASA gave the green light for the mission on Tuesday after a detailed inspection known as a flight readiness review.

That doesn't mean things can't go wrong with a rocket and a capsule flying for the first time.

- 'Inherent risk' -

"We're doing something that is incredibly difficult to do and does carry inherent risk in it," said Mike Sarafin, the Artemis 1 mission manager.

Because it is an uncrewed flight, Sarafin said the mission will continue in conditions that would not be acceptable for a flight with astronauts.

"If we had a failed solar array deployment we would proceed, and that is something that we wouldn't necessarily do on a crewed flight," he said.

A complete failure would be devastating for a program that is costing $4.1 billion per launch and is already running years behind schedule.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

While the Apollo astronauts who walked on the Moon were exclusively white men, the Artemis program plans to include the first woman and person of color.

And since humans have already visited the Moon, Artemis has its sights set on another lofty goal -- an eventual crewed mission to Mars.

Gateway would serve as a staging and refueling station for a voyage to Mars that would take a minimum of several months.

"I think it's going to inspire even more than Apollo did," Bob Cabana, associate NASA administrator and a former astronaut, said of Artemis. "It's going to be absolutely outstanding."

X.So--ThChM